Quick Summary
Covering the latest research from top Wall Street investment banks

Computex 2026 highlights opportunities in AI server power, BMC, and CPO switches

Institution
JPMorgan
Date
2026-06-07
Authors
Albert Hung, Gokul Hariharan, William Yang, Anthony Leng, Jimmy Huang
Company
-
Ticker
-
Industry
AI / Computer Hardware / Information Technology Services
Rating
Multiple companies covered; ratings include OW, N, and UW
NeutralLow confidenceThe report remains constructive on demand for the AI server supply chain, BMC, power supplies, SiC, capacitors, BBU, and CPO switches, but highlights uncertainties around the timing of Kyber racks, the mass-production pace of AMD Helio, changes in VR Ultra configuration, and the maturity of the AI PC ecosystem.
AuthorsAlbert Hung, Gokul Hariharan, William Yang, Anthony Leng, Jimmy Huang
CoverageChina、Europe
Asset classesEquity
Business segmentsAI servers and GPU racks、BMC、HVDC power supply and BBU、Liquid cooling and rack assembly、SiC/GaN power semiconductors、Capacitors、CPO/NPO switches、AI PC
Research firm divisions/subsidiariesJPMorgan(Other)、J.P. Morgan Securities (Taiwan) Limited(Other)、J.P. Morgan Securities (Asia Pacific) Limited(Other)、J.P. Morgan Broking (Hong Kong) Limited(Other)

AI summary card

Computex 2026 highlights opportunities in AI server power, BMC, and CPO switches

J.P. Morgan believes platforms related to NVIDIA Vera Rubin/VR200 will drive upside in demand for BMC, HVDC power supplies, SiC, capacitors, BBU, and CPO switches, although uncertainty remains around the timing of Kyber racks, AMD Helio mass production, and the AI PC ecosystem.

The report is an industry conference note covering multiple companies: ASPEED, Asia Vital Components, Delta, Hon Hai, Infineon, Nichicon, Quanta, TDK, and Wiwynn are rated OW; Inventec, ON Semiconductor, Pegatron, STMicroelectronics, and Wistron are rated N; Nippon Chemi-Con and Wolfspeed are rated UW.
Computex 2026AI serversNVIDIA Vera RubinHVDC power supplyASPEED BMCCPO switchesSiC power semiconductorsAI PC
  • The Kyber GPU rack may face uncertainty or delays due to backplane signal integrity challenges, while Rubin Ultra NVL144 is still evaluating alternatives such as dual NVL72 interconnect and NVLink CPO switching.
  • The VR200 power shelf configuration is expected to remain unchanged despite a reduction in chip TDP; Delta expects HVDC adoption in the VR200 generation at around 20%, above the prior assumption of about 15% power-rack adoption.
  • ASPEED benefits from longer demand visibility for servers driven by agentic AI, the ramp-up of AST2700, and increased complexity in NVIDIA modular systems, leaving room for upside to 2027 BMC revenue forecasts.
  • Vera CPU has attracted early interest from some U.S. hyperscalers, with potential shipments starting around 2Q26, benefiting BMC, liquid cooling, and DRAM suppliers, but with a more mixed impact on CPU socket suppliers.
  • CPO switches are expected to ramp rapidly over the next 1-2 years, with scale-out CPO reaching mass production earlier than scale-up CPO, and higher project margins benefiting ODMs and switch vendors.

Report interpretation

Overview

This report summarizes JPMorgan's second set of observations on the Asian technology hardware supply chain during Computex 2026, focusing on areas including the NVIDIA Vera Rubin/VR200 platform, the AMD Helio system, AI server power architecture, BMC, SiC/GaN power semiconductors, capacitors/BBU, CPO switches, and AI PCs. The overall conclusion is that demand for AI datacenter hardware should continue expanding, but there is divergence across segments in mass-production timing, adoption rates, and degree of benefit.

Core views

The core views include: first, NVIDIA's Kyber GPU rack may be delayed due to backplane signal integrity issues, and Rubin Ultra NVL144 still needs to choose between dual NVL72 interconnect and NVLink CPO switching; second, demand for VR200 and HVDC power racks has upside potential, with product displays and management commentary from Delta and others pointing to higher adoption rates; third, ASPEED BMC benefits from rising AI server system complexity and longer order visibility, and 2027 revenue forecasts may be revised upward; fourth, early Vera CPU demand is positive for BMC, liquid cooling, and DRAM, but has mixed implications for the CPU socket supply chain; fifth, due to lower space efficiency in the ORW form factor and a longer design cycle, AMD Helio cabinet-level mass production for CSPs may be delayed until 1H27; sixth, CPO switches, SiC, capacitors, and BBU, among other power and interconnect-related segments, are likely to become incremental beneficiaries of expanding AI datacenter capital expenditure.

Analysis framework

The report mainly cross-validates observations from Computex exhibits, JPMorgan booth visits, supply-chain research, discussions with company management, and the team's existing forecasts, with a focus on assessing investment implications from mass-production timing, per-rack power/component configuration, adoption rates, supply-chain content per system, and customer demand visibility.

Methodology notes

  • Supply chain researchCross-validation of Computex exhibits and company interviews

    Validate new platform designs and adoption rates through trade show displays, management commentary, and supply-chain checks.

    The report combines products shown by NVIDIA, AMD, and ODM/power/switch vendors at Computex with JPMorgan's research on customer demand, production ramps, and component configurations to determine which segments face upside to revenue TAM or timing risks.

  • Platform teardownAI server rack-level BOM and content analysis

    Break down supply-chain beneficiary segments across layers such as racks, trays, power shelves, BMC, power semiconductors, BBU, and switches.

    The report emphasizes differences in the system form factors of VR200, Vera CPU, Helio, and CPO switches, and uses these to infer changes in BMC attach rate, power semiconductor content, capacitor count, BBU capacity, and ODM assembly efficiency.

  • Production ramp assessmentMP timing and adoption-rate scenario analysis

    Use mass-production timing, adoption rates, and design maturity to judge the pace of revenue recognition.

    For example, Kyber remains about 1.5 years away from mass production and faces signal integrity challenges, AMD Helio rack-level production has been pushed to 1H27, while scale-out CPO switches are expected to enter mass production earlier than scale-up CPO.

Asset mapping & comparison

Structured mapping from thesis to named assets (strengths, weaknesses, peers, risks).

  • ASPEED Technology Inc. (5274.TWO)
    Beneficiary target in AI server BMC
    Strengths
    Order visibility extends into 2027, AST2700 is ramping, and NVIDIA modular systems increase BMC attach rate.
    Weaknesses
    Near-term revenue momentum may be constrained by supply limitations.
    Comparison
    Compared with about 3 months of visibility in traditional servers, agentic AI-related server buildouts bring unusually long demand visibility.
    Risks
    If AI server buildouts slow, supply improvements disappoint, or customers adopt custom designs, upside to BMC revenue may be lower than expected.
  • Delta Electronics, Inc. (2308.TW)
    Beneficiary target in HVDC power supply, BBU, and gray-space power infrastructure
    Strengths
    Comprehensive HVDC product portfolio, with management expecting around 20% HVDC adoption in the VR200 generation, while also expanding into SOFC, SST, PCS, energy storage, and microgrid controllers.
    Weaknesses
    The company explicitly does not enter liquid-cooling gray-space products such as chillers and water facilities.
    Comparison
    Compared with the previous assumption of about 15% power-rack adoption, a 20% HVDC adoption rate implies upside to power revenue TAM.
    Risks
    Changes in VR Ultra configuration, rising costs of power components such as SiC, lower-than-expected HVDC penetration, or delays in gray-space product ramp-up.
  • Hon Hai Precision (2317.TW)、Quanta Computer Inc. (2382.TW)、Wistron Corporation (3231.TW)、Wiwynn Corp (6669.TW)
    AI server ODM and rack assembly supply chain
    Strengths
    The modular and cableless VR200 design shortens assembly time, helping improve yield, accelerate ramp-up, and reduce working capital pressure; Wiwynn and Wistron displayed AMD/NVIDIA-related systems.
    Weaknesses
    Platform designs are still evolving, and the AMD Helio rack form factor has lower space efficiency with delayed production timing.
    Comparison
    The VR200 NVL72 compute tray production cycle of about 5 minutes is significantly shorter than the roughly 2 hours for a GB300 tray.
    Risks
    Customer customization, platform delays, yield ramp, rack design changes, and CSP demand volatility.
  • Infineon Technologies、STMicroelectronics、Wolfspeed、ON Semiconductor
    SiC/GaN power semiconductor supply chain
    Strengths
    In 800V HVDC racks, SiC could become a key device in AC/DC PSUs, e-Fuse, and 800V-to-54V DC/DC conversion, with SiC content per PSU potentially several times that of traditional silicon-based power semiconductors.
    Weaknesses
    GaN is still in the qualification stage, and high-voltage applications are constrained by voltage limits.
    Comparison
    Datacenters currently contribute only a small share to SiC TAM, but this may rise to a mid- to high-single-digit share over the next 2-3 years.
    Risks
    Qualification progress, cost, supply assurance, customer design choices, and EV-driven volatility in the SiC supply-demand cycle.
  • Nichicon、Nippon Chemi-Con、TDK、Musashi
    Traditional capacitor and supercapacitor supply chain
    Strengths
    AI workloads raise requirements for power stability and transient response, and the number of aluminum electrolytic capacitors in NVIDIA's 3RU 110kW power shelf could increase by more than 10x.
    Weaknesses
    Some hyperscalers may choose standalone supercapacitor shelves, so the degree of benefit to traditional capacitors depends on customer architecture.
    Comparison
    Traditional capacitors benefit from higher PSU content, while supercapacitors benefit from solutions pairing a 72kW power shelf with a standalone 1RU supercapacitor shelf.
    Risks
    Platform design changes, customer choices on space utilization, material costs, and supply stability.
  • Dynapack (3211 TT)、AES (6781 TT)
    Potential beneficiary targets in BBU and battery packs
    Strengths
    If customers extend backup power duration, BBU capacity and per-rack value would rise mechanically.
    Weaknesses
    Current power-rack BBUs usually support only about 1-2 minutes of ride-through, and whether demand upgrades remains a customer decision.
    Comparison
    Compared with about 5 minutes of backup duration for UPS, existing BBU duration is shorter, leaving room for expansion toward standalone BBU racks.
    Risks
    Customers not increasing backup power requirements, battery cost, safety certification, and system integration complexity.
  • NVIDIA/MediaTek RTX Spark AI PC ecosystem
    AI PC theme and edge AI demand observations
    Strengths
    NVIDIA and MediaTek jointly launched the RTX Spark AI PC chip, expected to be broadly available in 3Q26.
    Weaknesses
    The report has not yet seen a significant change in the fundamental ecosystem, powerful agentic AI models can run in the cloud, and there are still concerns about Windows on Arm compatibility.
    Comparison
    The report compares this with the QCOM AI PC rally at end-2024 and believes stock gains driven by AI PCs after Computex may fade.
    Risks
    Lack of a killer app that must run locally, pricing that is too high, compatibility issues, and insufficient consumer replacement demand.
  • Wistron、Accton/Edgecore、Ayar Labs、GUC、Hon Hai
    CPO/NPO switch and AI network interconnect supply chain
    Strengths
    The 102.4T Spectrum-6 photonic switch and 3.2T scale-up CPO projects indicate that CPO switches may ramp rapidly over the next 1-2 years, with high margins on switch projects.
    Weaknesses
    Scale-up CPO switch mass production lags scale-out CPO, and some projects are still in the design or co-development stage.
    Comparison
    Scale-out CPO is expected to reach mass production later this year or early next year, while scale-up CPO is expected to reach mass production from end-2027 to early 2028.
    Risks
    CPO maturity, customer adoption pace, yield, optoelectronic integration complexity, and platform timing changes.

Key data

  • Kyber GPU rack mass-production target2H27The report states that the Kyber GPU rack is targeted for mass production in 2H27, but backplane signal integrity challenges create uncertainty.
  • Potential reduction in VR200 chip TDPfrom about 2.3kW to about 1.8kWEven with the TDP adjustment, the report expects the rack-level AC/DC PSU configuration to remain at four 110kW power shelves per rack.
  • Delta's expected HVDC adoption rate for the VR200 generationabout 20%This is above JPMorgan's prior regular + high-voltage power rack adoption assumption of about 15%, implying upside to power revenue TAM.
  • AST2700 penetration forecast20-30% by end-2027ASPEED BMC revenue is expected to benefit from server TAM expansion, the AST2700 ramp, and improved supply.
  • Vera CPU unit forecastabout 600,000 units in 2026; about 3 million units in 2027Including head nodes, with further upside if demand is stronger.
  • CPU count per Vera CPU rack32 per air-cooled rack; 256 per liquid-cooled rackWistron displayed both air-cooled and liquid-cooled Vera CPU rack configurations.
  • AMD Helio rack powerabout 240kWThe system consists of 18 compute trays, 72 AMD MI455 GPUs, and 6 switch trays, with total power supply capacity of about 432kW.
  • VR200 NVL72 compute tray production cycleabout 5 minutesThis is significantly shorter than the roughly 2 hours for a GB300 tray, benefiting from modular, cableless, and midplane design.
  • Datacenter SiC device TAM contributionabout US$400-500mn or less by 2028 or laterThe report believes datacenters' contribution to SiC device TAM could rise from low single digits to mid- to high-single digits within 2-3 years.
  • Delta SOFC delivery targetabout 100MW over the next two yearsAt US$4-5/W, this corresponds to about US$400mn in revenue, or around 1% of total revenue.
  • Hon Hai CPO switch shipment outlookabout 10,000 units this year, more than doubling next yearThe report expects CPO switches to ramp rapidly over the next 1-2 years.

Impact & implications

From an investment perspective, AI server platforms are expanding from single GPU racks into more complex rack clusters and combinations of CPU/storage/switching/power systems, increasing content opportunities in BMC, power semiconductors, capacitors, BBU, liquid cooling, and ODM assembly. The main beneficiaries are more likely to be Delta, ASPEED, Wiwynn, Quanta, Hon Hai, some CPO switch suppliers, and the SiC/capacitor supply chain; by contrast, the AI PC theme lacks support from a clear local killer app, while AMD Helio and NVIDIA Kyber require continued monitoring of design maturity and mass-production timing.

Risks

  • Backplane signal integrity issues at Kyber may delay NVIDIA's next-generation GPU rack design decisions and mass production.
  • Changes in VR Ultra configuration may affect adoption of HVDC power racks, while rising costs of power components such as SiC could limit 100% penetration.
  • ASPEED's near-term BMC revenue may be constrained by supply, and customer custom designs could also reduce the standard BMC attach rate.
  • AMD Helio's ORW form factor has lower space efficiency, and silicon and UBB design cycles may be longer than expected, potentially delaying rack-level mass production for CSP projects.
  • AI PCs lack a killer app that must run locally, while Windows on Arm compatibility and end-device pricing may suppress demand.
  • New technologies such as CPO, GaN, SiC, BBU, and supercapacitors still face risks around qualification, cost, yield, and supply assurance.

What to watch

  • Progress of M10 CCL qualification, solutions to Kyber backplane signal integrity, and NVIDIA's final choice for the Rubin Ultra NVL144 architecture.
  • HVDC adoption rates for VR200 and VR Ultra, rollout of 660kW/560kW PSU/BBU solutions, and orders for vendors such as Delta, Lite-On, Flextronics, and Vertiv.
  • ASPEED AST2700 ramp-up, pace of supply improvement, and the quarter-over-quarter BMC revenue trend from 4Q26 to 1H27.
  • Early project progress for Vera CPU among U.S. hyperscalers, potential shipments in 2Q26, and whether 2027 unit demand exceeds about 3 million units.
  • The timeline for AMD Helio from small-batch production to rack-level mass production, especially small-volume progress in late 3Q26 to 4Q26 and mass-production progress in 1H27.
  • CPO switch shipment volumes, mass-production timing for Spectrum-6 scale-out projects, and progress of Ayar Labs/GUC scale-up CPO projects from end-2027 to early 2028.
  • Changes in datacenter content for SiC, GaN, capacitors, e-Fuse, and BBU, and whether requirements for power safety and backup duration are upgraded.
Zhejiang ICP No. 2022035445-5
Disclaimer: Market data, charts, indicators, research views, and other information provided on this website are intended solely for information display, research communication, and educational reference. They should not be regarded as personalized investment advice, securities recommendations, trading instructions, solicitations, or guarantees of return. While we strive to improve the reliability of our data and content, such information may still be subject to delays, errors, incompleteness, or untimely updates due to source differences, methodological limitations, system processing, or market volatility. Users should exercise independent judgment based on their own circumstances and bear all risks and responsibilities arising from the use of this website.

Settings

Sign in to view recent logins